You did the sensible thing. You read the survey, picked out the items that really matter, and asked the seller for a reduction. The answer came back through the agent: no.

That's not the end of it. In England, Wales and Northern Ireland nothing is binding until contracts are exchanged, so a refusal is the start of a conversation, not a verdict. I'm Ben Murrell, a builder with nearly 30 years on site. I review RICS surveys for buyers, and I don't quote for or do the work, so I've no reason to make a problem sound bigger or smaller than it is.

Here are the five options you still have.

First, check why they said no

A flat "no" usually means one of three things, and each one points to a different option:

  • They don't believe the figure. Your request looked like a guess, or it included things that were visible at the viewing. Fix: a tighter, evidenced ask (option 4).
  • They can't afford it. A seller with little equity may genuinely be unable to drop the price but able to pay for a repair. Fix: options 1 to 3.
  • They think another buyer will pay. Check the listing history. A property that's already been reduced, or has sat for months, is a weaker hand than the agent's tone suggests.

Ask the agent, politely, which it is. You'll often get a straighter answer than you expect.

Option 1: ask the seller to fix it before exchange

Instead of money off, ask for a specific, defined repair to be done before exchange. "Repair the roof" is too loose. "Replace the cracked flashing to the rear chimney stack and renew the slipped slates on the rear slope, with an invoice and photos" is something your conveyancer can write into the deal.

This suits a seller who's short of cash but can pay a contractor, and smaller, well-defined jobs. It's riskier for bigger work, because the seller's contractor isn't working for you and the seller wants it done cheaply. There's more on that trade-off in fix before exchange or price reduction?

Option 2: split the cost

Meeting in the middle is how a lot of these end. If you asked for £6,000 against a costed list, offering to settle at £3,000 lets the seller say they didn't give in and lets you recover part of a real cost. Decide your figure before you make the offer, and make it once.

Option 3: a retention or a contribution at completion

Sometimes the price can't move because of the seller's onward purchase or mortgage. Ask your conveyancer whether part of the price can be held back until a repair is done, or whether the seller can contribute in another way. Not every lender or seller will agree, and your conveyancer needs to structure it properly, so treat this as a question for them, not a promise.

Option 4: narrow the ask to the urgent items

If your first request was long, cut it back. Drop anything cosmetic or anything you could see when you offered: a dated kitchen, tired decoration, single glazing you knew about. Keep the Condition Rating 3 items and anything a specialist has confirmed. Put a realistic cost against each one, not the top of every range.

A short list with evidence is much harder to refuse than a long list with a big number. The survey renegotiation calculator will give you a fair figure, and how much you can negotiate off after a survey covers the wording.

Option 5: walk away

Sometimes the right answer is to stop. I'd lean towards walking if:

  • the urgent work plus your moving costs goes past what you can afford;
  • there's movement, damp or a structural question nobody can answer before exchange;
  • your lender or insurer won't proceed on terms you can live with; or
  • you'd be buying a project you never wanted.

Before you withdraw, ask your conveyancer what you'll owe for work done so far. The should I pull out after a survey? guide goes through the decision in more detail.

How to choose

  • Small, defined defect, cash-poor seller: option 1.
  • Real cost, both sides keen: option 2.
  • Seller tied by their own chain or mortgage: option 3, via your conveyancer.
  • Your first ask was too broad: option 4, then try again.
  • Serious unknowns, or the numbers don't work: option 5.

Whatever you choose, do it quickly and in writing through the agent. Delays make sellers nervous and can push your mortgage offer towards its expiry date.

Related guides

Frequently asked questions

What can I do if the seller refuses to reduce the price after a survey?

You still have options before exchange: ask the seller to do a specific repair before exchange, split the cost, ask your conveyancer about a retention or contribution at completion, narrow your request to the urgent items with realistic costs, or walk away.

Can the seller refuse to negotiate after a survey?

Yes. A seller doesn't have to accept a lower offer, just as you don't have to proceed. In England, Wales and Northern Ireland neither side is bound until contracts are exchanged.

Is it better to ask the seller to fix it or to reduce the price?

For small, clearly defined jobs, a repair before exchange can work well. For bigger or less certain work, a price reduction is usually safer, because you then choose who does the work and how well it is done.

Should I walk away if the seller won't budge?

Not automatically. Walk if the urgent work takes you past your budget, if there is a structural or damp question nobody can answer before exchange, or if your lender or insurer won't proceed on terms you can accept.

Do you take commission or quote for the repairs?

No. Chat to Your Builder is independent: no commission, no referral fees, and we never quote for or do the work we review.

Work it out yourself

Free tools built on real 2026 builder rates. No sign-up, no email.

Builder review — £59