Independent builders · we never quote for the work

Chat to Your Builder
Advice hub · 29 guides

Buying a home: builder advice before you offer, and after the survey

The useful work starts at the viewing, not when the survey lands. Photograph the house, get a builder’s view on the listing and your photos if you want one before you offer, then book the right RICS survey and only then start costing and negotiating.

If you have just viewed a house and have not offered yet, start with the pre-offer viewing review or the builder’s viewing checklist.

Before you offer: look, then decide

A viewing is twenty minutes and a lot of nerves. Spend the first five minutes on the pavement looking at the roof, gutters and ground levels, photograph what you cannot judge in the room, and — if you want a builder’s eye on it — send the listing and those photos for a pre-offer viewing review. It is a head start, not a replacement for a RICS survey. Once you offer, do it subject to survey.

Read the report in this order

Condition Rating 3 items first: those are the surveyor’s actual concerns and the basis of any renegotiation. Then every instruction to obtain further investigation, written down as a list of jobs to commission before exchange. Then the caveats, which tell you how much of the building was never looked at. Only then the Condition Rating 2 list, which is ordinary maintenance that almost every house has.

"Further investigation is recommended" is a task, not a verdict

It means the surveyor could not see enough. An engineer’s report, a CCTV drain survey, an EICR or a damp inspection each cost a few hundred pounds and convert an open-ended risk into a number. Do them before exchange — afterwards you have no leverage and no way out.

Sellers respond to schedules, not to worry

What moves a price is a specific, evidenced, costed list of work that genuinely needs doing now, presented in one page through the agent. What does not move a price is a dated kitchen, single glazing or general decoration, because those were visible when you offered and the price already reflected them.

Work it out yourself, free

No sign-up, no email, real 2026 builder rates.

Every guide on this topic

First-time buyer reviewing a UK property listing with a builder before making an offer

Should You Take a Builder to a House Viewing — or Send the Photos Afterwards?

A builder on a second viewing can be useful, but you do not always need one in the room. When to take someone, when photos and the listing are enough, and how a £59 remote review fits.

Read the guide →

Staring at a RICS survey?

A working builder turns your survey into clear priorities, likely repair-cost ranges and the questions to ask next. Upload your survey or paste its link, add your details, then pay (or choose to send it after payment) — written review + call within 24 hours.

★★★★★
“I am so grateful to Ben for peace of mind and clarity I have after using his amazing service ! I was baffled by my level 3 survey … it was like dealing with a trusted family member who is an expert in the building trade … All of this happened within less than 24 hours of my enquiry and I received a very detailed report with an experienced but realistic perspective. …”
Ann Tordoff · Google review · October 2026 · 25 five-star reviews and growing
Review my RICS survey — £59

Upload your survey, add your details, then pay · written review + call within 24 hours · refund if it isn’t clear

Builder review — £59